ONSITEBUILDER
The central data creation and entry point for all TracTime products. Used by builders who build by phase or lot-by-lot. Allows the user to see all lots on 1 page. Revisions, weather delays,
workweek changes, and placing lots on inventory hold are a snap with TracTime. Includes basic report groups such as Milestone, Option Cutoff, Delivery, Call Point, Projection and Efficiency
reports. Also contains the unique “Catch Up” Report that tells you exactly what you have to do to get back on schedule and finish on time. |
 |
REMOTEBUILDER PC
As the field managers continue to embrace technology, RemoteBuilder PC allows the field easy access to subcontractor and supplier data. Dozens of reports are available in the field for instant
communication of job status and all are pre-formatted for fast printing in the field office. Enables actual dates, delays and notes to be entered on the jobsite. Offers the same two-way
synchronization as RemoteBuilder CE. |
 |
REMOTEBUILDER CE
Software and interface that controls, logs and synchronizes to and from the office using Windows CE handheld devices. Enables actual dates and delays to be entered on the jobsite and automatically
transmits them to the office. A true synchronization system that handles simultaneous scheduling changes in the office and the field. The handheld devices offer complete portability. Field
managers can enter data while walking the job, in the office or at home. |
 |
DATABASEBUILDER
Loads all TracTime scheduling data into an MDB or SQL 7 database. The data is then assessable for linking with other data stores on your network. Available for queries from TracTime’s ReportBuilder,
our stand-alone report engine. Also allows queries from any report engine that is compatible with MDB Jet 4 or SQL. |



 |
PROGRESSPAYBUILDER
TracTime’s accounting module that communicates with your existing accounting program. Sends all vital TracTime scheduling information directly to your accounting system which avoids double
entry of information and possible data entry errors. Saves dozens of accounting hours per week determining the status of contractor and vendor invoices. Current accounting interfaces include
JDEdwards, McCosker, Timberline, NuStar and many more. |
 |
REPORTBUILDER
TracTime’s stand-alone report engine that generates hundreds of customized reports. Allows specific filtering of data for accurate targeted analysis. Reporting categories include To-Do Lists,
Flash Reports, Contractor To-Do Lists, Summary Reports, Cycle Time Reports and Calendars. All of which can view one lot, a community, a division or multiple divisions or anything in between.
|
 |
NOTIFICATIONBUILDER
Automatically runs desired reports and sends them to your chosen recipients via FAX, email or web posting. It’s as easy as setting your alarm clock. Set it and forget it. Eliminates the
need to continually run reports and deliver them through a complicated routing procedure. You can rest assured that everyone is receiving what they need and what they want accurately and
on time. A must for the communication of critical information up and down the management ladder. |
 |
SUBTRAKKERBUILDER
Tracks contractor and supplier information and allows contractor-specific reporting. Coordinate all of the work of a specific contractor or supplier throughout your entire division. The
unique leveling and pooling feature will tell you in advance of critical material or contractor capability issues. Also prioritizes the work flow for the contractor to tell him where to
work today and what to do. |



 |
PROJECTBUILDER
The finishing touch in communication between TracTime and your accounting program. This module generates TracTime schedules automatically from the information contained in your accounting
system. As soon as a contract is entered into your accounting system or a lot is released, it is automatically entered into TracTime. Eliminates hours of work weekly and the need for double
entry of construction data. |
 |
CHARTBUILDER
This chart is quickly and easily generated with a click of a button from your current OnsiteBuilder data and the size is up to you, 11 x 17 to wall-size. The chart allows management, field
personnel and homeowner’s to view all lots or a single lot’s progress graphically. Colored milestone lines serve as a visual display of planned and actual completions, which can be used
for historical backup and future planning. |